hostname: login.marconi100.cineca.it
early availability: march 2020
start of production: to be defined (2020)
This system will be in production at the beginning of 2020 as an upgrade of the "non conventional" partition of the Marconi Tier-0 system. It is an accelerated cluster based on Power9 chips and Volta NVIDIA GPUs, acquired by Cineca within the PPI4HPC European initiative.
System Architecture
Architecture: IBM Power 9 AC922
Internal Network: Mellanox Infiniband EDR DragonFly+
Storage: 8 PB (raw) GPFS of local storage
Login nodes: 8 Login IBM Power9 LC922 (similar to the compute nodes)
Model: IBM Power AC922 (Whiterspoon) Racks: 55 total (49 compute) |
---|